United Orthopedic Corporation

6 Fix the chosen Femoral A/P Chamfer Cutting Guide 15 in the predrilled fixation pin holes (Note: it must be placed flush against the resected distal femur). Use Spike 8 or Femoral A/P Chamfer Guide Handle 16 to enhance the stability during resection and check resection thickness with the Lower Point Gauge 17 . Then, complete the four resection procedure with a 1.27 mm saw blade. At this point, the femoral preparation for posterior cruciate retaining femoral component is completed. A. Femoral Preparation A.5. A-P Chamfer Cutting 15 Femoral A/P Chamfer Cutting Guide 9303-2110-RC 9303-2120-RC 9303-2130-RC 9303-2140-RC 9303-2150-RC 9303-2160-RC 17 Lower Point Gauge, 1.3 mm 9301-2251 16 Femoral A/P Chamfer Guide Handle 9301-2291

RkJQdWJsaXNoZXIy MTcyNTM=